Page 12 - link magazine
P. 12

North Swindon Schools PH Project
                                                                                 Learning Campus

                                                                                 A state-of-the-art Learning Campus,
                                                                                 incorporating the four schools below,
                                                                                 will be built in North Swindon.
                                                                                 Primary School 6 is a new primary
                                                                                 school with a nursery.

                                                                                 Secondary School 1 will be a new
                                                                                 secondary school for 11-16 year olds
                                                                                 incorporating community and sports
                                    r'                                           facilities.
                                 ^F
                                                                                 The new Brimble Hill Special
                ',
                                                                                 School will provide education for two
                                                                                 to eleven year old children with severe
                                                                                 learning difficulties and profound and
                                                                                 multiple learning difficulties.
       Prinmry School 6: Re reation .-I rca
                                                                                 The new Uplands Special School
                                                                                 will provide education for eleven to
                                                                                 nineteen year old students with severe
       New Schools to be the Heart of the Community                              learning difficulties and profound and
                                                                                 multiple learning difficulties.
       SWINDON will get seven brand new        provided at both of the secondary  In addition, a Multi Agency Unit will
       schools through the North Swindon       schools.                          be located between the two special
       Schools PFI Project. This is great news                                   schools capable of serving all four
                                            There are also other facilities that will be
       for the staff and pupils of these schools
                                            built and be available to the community,  schools on the Learning Campus and
       who will benefit from state of the art
                                            some during the day. These include:  the surrounding community. The Unit
       facilities. The good news doesn't stop                                    will contain a hydrotherapy pool, a
       there though - the schools are also great  • Internet cafes at both of the  physiotherapy room, a speech therapy
       news for the local community.           secondary schools                 room and rooms that can be used as
       One of the key goals of the project was to  • A new youth centre at Moredon  clinics and by social workers.
       provide facilities that would be available
                                             • Youth and community rooms at the
       to the local conununity out of school
                                               Learning Campus
       hours. The wide rare of facilities that
       the community will have opportunity to  Lastly, but by no means least, the project
       use include:                         will provide another hydrotherapy pool
                                            for Swindon. The pool will be located
         • Sports — a wide range of sports                                                                        11
                                            on the Learning Campus and will be
          facilities including sports halls, a
                                            available to the pupils of the special
          gymnasium, two floodlit five a side
                                            schools and to the people of Swindon.
          football pitches, a floodlit all weather
          sports pitch, grass pitches for rugby,  Further information on the facilities
          football, hockey and athletics, tennis,  available will be published as the opening
          netball and basketball courts, a  dates draw nearer.
          cricket pitch and both indoor and
          outdoor practice nets.

         • Social Event Venues — there are
          a wide range of rooms that will
                                                                                                             ^ r  t
          be available to hire for weddings,
          parties, charity events, dances and
          other social events.
        • Lifelong Learning — the schools
          could be available as outreach centres
          for Universities and Colleges to
          deliver courses in the evenings, on  s1g
          weekends or during breaks in the
          school terms.
        • Arts — Arts organisations such as
          theatre, dance, drama and music
          groups could be accommodated in
          the specialist facilities that will be
                                            Uplands Special School: Entronre Courtyard
   7   8   9   10   11   12   13   14   15   16   17